Top and front loading
A top-loading tower carries equipment above the mast. A front-loading tower lifts a load on forks in front. GUIL ELC and ULK illustrate these different concepts; do not choose by the largest kilogram figure alone.
Working and transport dimensions
Check attachment height, outrigger footprint and stowed dimensions. Do not confuse a narrow transport base with the required working footprint. Include adapters and equipment remaining on the tower.
Preparing a selection
Enter mass and height requirements in the configurator, then compare geometry and attachments. Front loads also require centre-of-gravity information and manufacturer conditions. A filtered result is a shortlist, not installation approval.
Prepare these details
Your discussion-preparation list. Checking items is not a technical inspection or approval for use. Stored only in this browser.
Two more useful answers
Is the winch rating the tower capacity?
No. The complete tower’s declared capacity governs.
Are ELC-730 and ELC-730/R interchangeable?
Do not assume so. The suffix identifies another variant with its own data.
Sources and further reading
Editorial summary · checked 11 September 2026. International guidance provides technical context, not a statement of Croatian regulations. Current instructions for the exact model take precedence.















































































PANGOLIN LASER SYSTEMS · LUMILASSoftware, control & safety

